Ready, set, go!

Off we went to Masterton to further press our requirements and get more answers to our question. I must say that the salesperson has been very pleasant and accommodating throughout. We have requested again that they consider allowing us to have a 900mm stove top and rangehood which this time they said should be possible at least with the stove top which i suppose is the least we want. They were not able to give us the same deal on the air conditioning but still gave a reasonable price.

I spent most of the time trying to amuse our son whilst the hubby went over the details but all in all, we are happier with Masterton's design, quote and service. So we have put down the deposit to continue on with the tender and submission to council.

In case I haven't specified yet, we are going with the Fernleigh design with Vogue facade but for a single garage given that our frontage is only 11.6 metres wide and due to council restrictions. Strangely enough, the Fernleigh appears to be identical to their Villina design but the Villina is more expensive. We have also opted for the alfresco at the back but will probably handle our flooring and alfresco deck ourselves.

So now we are waiting on the tender to be redesigned and a contour survey to be drawn. Will take a few weeks still prior to council submission.

Thursday, June 26, 2008

Allcastle tender... burnt to a crisp!

Well we received our tender from Allcastle and really didn't have too much to say as the saleswoman went through the details. I think we were thinking that it was a lot more expensive to Masterton's quote.

Fixed site costs were about 5K but provisional site costs came out to 41K! compared to about 6K provisional site costs from Masterton. The alfresco area attracted the most cost, with the whole thing costing about 20K compared to Masterton's quote of about 8-10K. It was really hard to compare the two tenders as the two companies had different suggestions for ways of doing the alfresco and storm water etc so it made it difficult in the end to decide which company's recommendation was the best.
Additionally, we were concerned about double handling and traffic control as our land is on the main road with no stopping in front. We reminded the Allcastle sales rep who said it shouldn't be a problem although there was a clause to say they could charge if it turned out to cost something. So we asked her to chase it up again as it was costing us several thousand from Masterton for double handling.

Other additional costs from Allcastle were squaring off the rounded corners of the dining area as our council has privacy issues with windows facing neighbours. The quote for squaring off the top and bottom came to more than 10K as well as another 12K for 2.7 metre ceiling height to top and bottom as required by council. Masterton only gave us quote for the bottom at about 5K so i imagine it will turn out less than Allcastle's quote plus the Masterton design does not need any squaring off the corners.

At this point we are heavily leaning to Masterton as the price seems cheaper and includes alfresco plus the inclusions in the Mansion package are also pretty good. They also knocked 5K off the price when we complained about the high site costs. They offered us a deal on airconditioning but as our tender has past the two week due date, they are reconsidering this. Our only drawback with Masterton is they have two kitchen options only, the entertainer or conniseur design. We wanted to have 900mm cooktop and rangehood but this is only available on the conniseur package but we don't want to upgrade totally to this package. We will see on our next meeting whether we can push for this still.